Stantec was retained by MDWASD to provide Design Services for all Consent Decree Projects at all three Wastewater Treatment Plants. METCO, as one of the major subconsultants, is responsible for developing Design Report and Detailed Design Documents related to Electrical, I&C and HVAC system improvements in various process areas at these Wastewater Treatment Plants. 

As part of the Master Contract for the Program, METCO was tasked to develop Preliminary Design Task Memorandum, Detailed Design Documents and Construction Assistance Services for major Electrical, and I&C improvements associated with the Primary Clarifiers at the North District Wastewater Treatment Plant.

METCO was responsible to provide the above services for the following key project elements:

  • Replace Electrical Power System to Primary Clarifiers No. 1-6 and associated Auxiliary System.
  • Replace MCC’s and Feeders to all connected loads in the Primary Sludge Pump Stations1 & 2.
  • Replace Lighting System in the Pump Station and in the Clarifiers.
  • HVAC and Plumbing System Upgrades at the Primary Sludge Pumping Station.